Pertanika Journal of Science & Technology, Volume 29, Issue 1, March 2021
DOI: https://doi.org/10.47836/pjssh.29.1.35
Keywords: ATLAS.ti 8, construction industry, IBS research, Industrialised Building System, thematic review
Published on: 26 March 2021
IBS has been theoretically and practically proven to improve the construction delivery apart from reducing the lead of time and cost throughout its supply chain. Under the Malaysian Construction Industry Transformation Programme (CITP) 2016-2020, it is stated that the government is accelerating the adoption of IBS through mechanisation and modern practices. Despite the government’s initiative, there have been relatively small amounts of materials published discussing the patterns in IBS publications in Malaysia and what the future holds for IBS. This paper explores a thematic review of the literature regarding new definitions and patterns that juxtaposes IBS in the construction industry in Malaysia from 2015 till 2019 by using the thematic review. The findings from the code-to-document analysis using ATLAS.ti 8 found that the patterns and trends on IBS from the year 2015 to 2019. This paper contributes to analysing the patterns and trends of IBS by identifying the thematic code within IBS publications for recommendations of future studies on IBS in Malaysia.
Aljawadi, A. S., Marsono, A. K., & Ismail, C. R. (2019). Ductility of reinforced concrete sub frame for Industrialized Building System. Jurnal Teknologi, 81(2), 1-9. https://doi.org/10.11113/jt.v81.11452
Amin, M. A. M., Abas, N. H., Shahidan, S., Rahmat, M. H., Suhaini, N. A., Nagapan, S., & Rahim, R. A. (2017). A review on the current issues and barriers of Industrialised Building System (IBS) adoption in Malaysia’s construction industry. IOP Conference Series: Materials Science and Engineering, 271(1), 012031. https://doi.org/10.1088/1757-899X/271/1/012031
Ariffin, H. L. T., Mohd, N. I., Mustaffa, N. E., Bandi, S., & Chee, C. H. M. (2019). Perspectives on issues and the application of the innovative procurement approaches for the Industrialised Building System (IBS). International Journal of Built Environment and Sustainability, 6(1), 39-43. https://doi.org/10.11113/ijbes.v6.n1.328
Ariffin, S. T., Yunus, R., Mohammad, H., & Yaman, S. K. (2017). A preliminary review on Economies of Scale (EOS) towards Industrialized Building System (IBS) manufacturer. MATEC Web of Conferences, 103, 03008. https://doi.org/10.1051/matecconf/201710303008
Aris, N. A. M., Fathi, M. S., Harun, A. N., & Mohamed, Z. (2019). Towards a sustainable supply of affordable housing with prefabrication technology: An overview. Journal of Advanced Research in Business and Management Studies, 15(1), 1-13.
Azman, N. S. S., Ramli, M. Z., & Zawawi, M. H. (2018). Factors affecting quality management of construction project using industrialized building system: A review. International Journal of Engineering and Technology (UAE), 7(4), 307-311. https://doi.org/10.14419/ijet.v7i4.35.22751
Benros, D., & Duarte, J. P. (2009). An integrated system for providing mass customized housing. Automation in Construction, 18(3), 310-320. https://doi.org/10.1016/j.autcon.2008.09.006
Chia, F. C., Skitmore, M., Runeson, G., & Bridge, A. (2012). An analysis of construction productivity in Malaysia. Construction Management and Economics, 30(12), 1055-1069. https://doi.org/10.1080/01446193.2012.711910
Clarke, V., & Braun, V. (2013). Teaching thematic analysis: Overcoming challenges and developing strategies for effective learning. The Psychologist, 26(2), 120-123.
Ern, P. A. S, Kasim, N., Hamid, Z. A., & Chen, G. K. (2017). Critical ICT-inhibiting factors on IBS production management processes in the Malaysia construction industry. IOP Conference Series: Materials Science and Engineering, 245(3), 032067. https://doi.org/10.1088/1757-899X/245/3/032067
Fateh, M. A. M., & Mohammad, F. M. (2017). IBS provision in local and international standard form of contracts. Journal of Construction in Developing Countries, 22(2), 1-12. https://doi.org/10.21315/jcdc2017.22.2.5
Fateh, M. A. M., Mohammad, M. F., & Shukor, A. S. A. (2017). Review in formulating the standard form of contract for Industrialized Building System (IBS) construction approach in Malaysia. MATEC Web of Conferences, 87, 01001. https://doi.org/10.1051/matecconf/20178701001
Fateh, M. A. M., Zakariah, H., & Ezanee, S. E. (2020). Improvement for significant clauses in the standard form of contract for industrialized building system construction. IOP Conference Series: Materials Science and Engineering, 713, 012037. https://doi.org/10.1088/1757-899x/713/1/012037
Fauzi, M. A., Hassan, S. H., Yunus, J. N., Sulaiman, H., & Hashim, M. Z. (2017). A feasibility study of Supply Chain Management (SCM) in Industrialized Building System (IBS) from contractor’s perspective: A case study. Journal of Engineering and Applied Sciences, 12(5 SI), 6916-6921. https://medwelljournals.com/abstract/?doi=jeasci.2017.6916.6921
Ghazali, M. A. A., Bahardin, N. F., Zaidi, M. A., Baharuddin, M. N., & Yusof, M. R. (2016). Literature mapping: Critical factors in industrialized building system plastic formwork application. International Review of Management and Marketing, 6(S7), 204-208.
Haron, N. A., Abdul-Rahman, H., Wang, C., & Wood, L. C. (2014). Quality function deployment modelling to enhance Industrialised Building System adoption in housing projects. Total Quality Management & Business Excellence, 26(7-8), 703-718. https://doi.org/10.1080/14783363.2014.880626
Ismail, S. (2018). Developing a framework for sustainable Industrialised Building Systems for infrastructure projects in Malaysia (Doctoral thesis). Queensland University of Technology.
Ismail, Z.-A. (2017). A case study of maintenance management systems in Malaysian complex and high-rise IBS buildings. Journal of Steel Structures & Construction, 3(2), 7650. https://doi.org/10.4172/2472-0437-C1-003
Ismail, Z.-A. (2018). An Integrated Computerised Maintenance Management System (I-CMMS) for IBS building maintenance. International Journal of Building Pathology and Adaptation, 37(3), 326-343. https://doi.org/10.1108/IJBPA-10-2017-0049
Ismail, Z.-A., Mutalib, A. A., & Hamzah, N. (2018). Improving contractor social networking on IBS infrastructure maintenance projects: A review. Engineering, Construction and Architectural Management, 25(4), 479-496. https://doi.org/10.1108/ECAM-08-2016-0180
Jabar, I. L., Ismail, F., & Aziz, A. R. A. (2015). Public participation: Enhancing public perception towards IBS implementation. Procedia - Social and Behavioral Sciences, 168, 61-69. https://doi.org/10.1016/j.sbspro.2014.10.210
Jin, T., Zhou, Z., Chang, W., & Huang, X. (2017). Man-made targets pose estimation using time-frequency distribution in UWB SAR. 2005 IEEE International Geoscience and Remote Sensing Symposium, 7(1), 4633-4635. https://doi.org/10.1109/IGARSS.2005.1526701
Jonsson, H., & Rudberg, M. (2014). Classification of production systems for industrialized building: A production strategy perspective. Construction Management and Economics, 32(1-2), 53-69. https://doi.org/10.1080/01446193.2013.812226
Kamaruddin, S. S., Mohammad, M. F., & Mahbub, R. (2018). IBS: An economic perspective on mechanisation and automation. Asian Journal of Quality of Life, 3(9), 87-98. https://doi.org/10.21834/ajqol.v3i9.80
Maniam, H., Nagapan, S., Abdullah, A. H., Subramaniam, S., & Sohu, S. (2018). A comparative study of construction waste generation rate based on different construction methods on construction project in Malaysia. Engineering Technology & Applied Science Research, 8(5), 3488-3491. https://doi.org/10.48084/etasr.2340
Marsono, A. K., Ying, W. J., Tap, M. M., Chieh, Y. C., & Haddadi, A. (2015). Standard verification test for Industrialised Building System (IBS) repetitive manufacturing. Procedia CIRP, 26, 252-257. https://doi.org/10.1016/j.procir.2014.07.047
Md. Ali, M., Abas, N. H., Affandi, H. M., & Abas, N. A. (2018). Factors impeding the Industrialized Building System (IBS) implementation of building construction in Malaysia. International Journal of Engineering & Technology, 7(4), 2209-2212. https://doi.org/10.14419/ijet.v7i4.17863
Mohammad, M. F., Baharin, A. S., Musa, M. F., & Yusof, M. R. (2016). The potential application of IBS modular system in the construction of housing scheme in Malaysia. Procedia - Social and Behavioral Sciences, 222, 75-82. https://doi.org/10.1016/j.sbspro.2016.05.189
Muhaidin, N. H. M., & Chan, H. B. (2018). The comparison of construction waste produced by conventional method against IBS: A case study in Pulau Pinang. AIP Conference Proceedings, 2020(1), 020055. https://doi.org/10.1063/1.5062681
Muhammad, W. M. N. W., Azman, M. A., Othman, M. K. F., Hadi, N. A., Sahimi, S. N. S., & Mohammad, M. F. (2016). The insight of Industrialised Building System (IBS) by Bumiputera construction players. MATEC Web of Conferences, 47, 04013. https://doi.org/10.1051/matecconf/20164704013
Musa, M. F., Mohammad, M. F., Mahbub, R., & Yusof, M. R. (2018). Adopting modular construction in the Malaysian construction industry. Asian Journal of Environment-Behaviour Studies, 3(10), 1-9. https://doi.org/10.21834/aje-bs.v3i10.307
Musa, M. F., Mohammad, M. F., Yusof, M. R., & Ahmad, R. (2016). Industrialised Building System Modular System (IBSMS) organisational readiness framework. Procedia - Social and Behavioral Sciences, 222, 83-92. https://doi.org/10.1016/j.sbspro.2016.05.191
Nasir, N. M., Nawi, M. N. M., Rahim, M. K. I. A., Bahaudin, A. Y., Tapa, A., Nasrun, M., Nawi, M. N. M., Kamarul, M., Abdul, I., & Bahaudin, A. Y. (2016). A review of delay factors in Malaysian Industrialized Building System (IBS) construction project. ARPN Journal of Engineering and Applied Sciences, 11(16), 9868-9873.
Nasrun, M., & Nawi, M. (2015). Barriers to implementation of the Industrialised Building System (IBS) in Malaysia. The Built & Human Environment Review, 4, 22-35.
Nawi, M. N. M., Anuar, H. S., & Lee, A. (2013). A review of IBS Malaysian current and future study. International Journal of Engineering Research & Technology, 2(10), 2378-2383.
Nawi, M. N. M., Lee, A., Mydin, M. A. O., Osman, W. N., & Rofie, M. K. (2018). Supply Chain Management (SCM): Disintegration team factors in Malaysian Industrialised Building System (IBS) construction projects. International Journal of Supply Chain Management, 7(1), 140-143.
Nawi, M. N. M., Mydin, M. A. O., Nifa, F. A. A., Osman, W. N., & Anuar, H. S. (2015). Malaysian Industrialised Building System (IBS): A review of studies. Australian Journal of Basic and Applied Sciences, 9(7), 99-101.
Nawi, M. N. M., Nasir, N. M., Azman, M. N. A., Jumintono, & Khairudin, M. (2019). Investigating factors of delay in IBS construction project: Manufacturer perspectives. Journal of Engineering Science and Technology, (Special Issue on ICEES2018), 59-66.
Noguchi, M. (2003). The effect of the quality-oriented production approach on the delivery of prefabricated homes in Japan. Journal of Housing and the Built Environment, 18, 353-364. https://doi.org/10.1023/B:JOHO.0000005759.07212.00
Noor, S. R. M., Yunus, R., Abdullah, A. H., Nagapan, S., & Mazlan, S. M. S. S. (2018). Insights into the adoption of lean management in Industrialised Building System (IBS) implementation: The drivers and challenges. International Journal of Engineering and Technology (UAE), 7(3.23), 22-31. https://doi.org/10.14419/ijet.v7i3.23.17253
Othman, M. K. F., Muhammad, W. M. N. W., Hadi, N. A., & Azman, M. A. (2017). The significance of coordination for Industrialised Building System (IBS) precast concrete in construction industry. MATEC Web of Conferences, 103, 03004. https://doi.org/10.1051/matecconf/201710303004
Piroozfar, P., Altan, H., & Popovic-Larsen, O. (2012). Design for sustainability: A comparative study of a customized modern method of construction versus conventional methods of construction. Architectural Engineering and Design Management, 8(1), 55-75. https://doi.org/10.1080/17452007.2012.650935
Pozin, M. A. A., & Nawi, M. N. M. (2018). Effective of communication using WhatsApp: Industrialised Building System (IBS) construction. AIP Conference Proceedings, 2016(1), 020018. https://doi.org/10.1063/1.5055420
Rashidi, A., & Ibrahim, R. (2017). Industrialized construction chronology: The disputes and success factors for a resilient construction industry in Malaysia. The Open Construction and Building Technology Journal, 11(1), 286-300. https://doi.org/10.2174/1874836801711010286
Razak, F. M., & Awang, H. (2014). The contractors’ perception of the implementation of Industrialised Building System (IBS) in Malaysia. MATEC Web of Conferences, 10, 04003. https://doi.org/10.1051/matecconf/20141004003
Shamsuddin, S. M., Zakaria, R., Hashim, N., Mohamad Yusuwan, N., Sahamir, S. R., & Abidin, N. I. (2017). A framework of initiatives for successful application of life cycle costing (LCC) in Industrialised Building System (IBS) in Malaysian construction industry. MATEC Web of Conferences, 138, 05002. https://doi.org/10.1051/matecconf/201713805002
Shamsuddin, S. M., Zakaria, R., & Mohamed, S. F. (2018). Economic attributes related to Industrialised Building System in Malaysia. Asian Journal of Behavioural Studies, 3(11), 65-73. https://doi.org/10.21834/ajbes.v3i11.102
Shamsuddin, S. M., Zakaria, R., Mohamed, S. F., Saleh, A. L., Utomo, C., Majid, M. Z. A., & Yahya, K. (2015). Developing methodology for cradle to grave cost planning for Industrialised Building System (IBS) in Malaysia. Jurnal Teknologi, 77(16), 37-42. https://doi.org/10.11113/jt.v77.6397
Waris, M., Liew, M. S., Faris, M., & Idrus, A. (2015). An exploratory study on enablers and barriers for onsite mechanisation in the Malaysian construction industry. Malaysian Construction Research Journal, 16(1), 15-30.
Waris, M., Liew, M. S., Khamidi, M. F., & Idrus, A. (2014). Investigating the awareness of onsite mechanization in Malaysian construction industry. Procedia Engineering, 77, 205-212. https://doi.org/10.1016/j.proeng.2014.07.018
Wen, T. J., Siong, H. C., & Noor, Z. Z. (2015). Assessment of embodied energy and global warming potential of building construction using life cycle analysis approach: Case studies of residential buildings in Iskandar Malaysia. Energy and Buildings, 93, 295-302. https://doi.org/10.1016/j.enbuild.2014.12.002
Yunus, R., Abdullah, A. H., Yasin, M. N., Masrom, M. A. N., & Hanipah, M. H. (2016). Examining performance of Industrialized Building System (IBS) implementation based on contractor satisfaction assessment. ARPN Journal of Engineering and Applied Sciences, 11(6), 3776-3782.
Yunus, R., Noor, S. R. M., Abdullah, A. H., Nagapan, S., Hamid, A. R. A., Tajudin, S. A. A., & Jusof, S. R. M. (2017). Critical success factors for lean thinking in the application of Industrialised Building System (IBS). IOP Conference Series: Materials Science and tableEngineering, 226, 012045. https://doi.org/10.1088/1757-899X/226/1/012045
Zairul, M. (2017). FlexZhouse: A new business model for affordable housing in Malaysia. In A+BE architecture and the built environment (Vol. 2, Issue 2). https://doi.org/10.7480/abe.2017.2
Zairul, M. (2020). A thematic review on student-centred learning in the studio education. Journal of Critical Reviews, 7(2), 504-511. https://doi.org/10.31838/jcr.07.02.95